Browse wiki

From Open Energy Information

Jump to: navigation, search
Data:02431e03-f559-4213-ae8f-efe5b6ca28bb
OpenEI/UtilityRate/DemandChargeWeekdaySchedule 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
OpenEI/UtilityRate/DemandChargeWeekendSchedule 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
OpenEI/UtilityRate/DemandRatchetPercentage 0  +
OpenEI/UtilityRate/DemandRateUnit kW  +
OpenEI/UtilityRate/Description AVAILABLE: To all customers. CHARACTER OF AVAILABLE: To all customers. CHARACTER OF SERVICE: 1. The District will provide the yard light, install the same on Applicant’s yard pole and will service and replace the lamp periodically and the yard light, when necessary, without cost to the Applicant. The District will maintain service and replace lamps only during normal working hours except in case of an emergency. If such services are required during times other than normal working hours, the Applicant agrees to pay for such services. 2. If the Applicant desires the farm yard light installed at a location other than the District’s meter pole, the Applicant shall pay for or furnish all labor and all the necessary materials required to install the farm yard light on the Applicant’s pole. In most cases, if not installed on meter pole and it is on an existing pole belonging to customer, there is no charge. 3. In the event the Applicant desires to have a second or third farm yard light installed at other locations than the District’s meter or yard pole, the Applicant’s obligations to the District are the same as outlined in paragraph 2. 4. Services and maintenance and replacements required and rendered by the District and which are free to the Applicant shall not be covered by this agreement if such services are necessitated by acts of vandalism. 5. All kwh will be run through the customer’s meter and billed at the applicable rate.s meter and billed at the applicable rate.
OpenEI/UtilityRate/FixedMonthlyCharge 1.95  +
OpenEI/UtilityRate/Name SECURITY LIGHT RENTAL 175-watt mercury vapor  +
OpenEI/UtilityRate/Sector Commercial  +
OpenEI/UtilityRate/Source http://www.erppd.com/Rate%20schedules/2012%20Rates/Lighting%20Rates/SEDC72.pdf
OpenEI/UtilityRate/StartDate 1 January 2011  +
OpenEI/UtilityRate/TOUWeekdaySchedule 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
OpenEI/UtilityRate/TOUWeekendSchedule 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
OpenEI/UtilityRate/TieredRateMonth1 1  +
OpenEI/UtilityRate/TieredRateMonth10 1  +
OpenEI/UtilityRate/TieredRateMonth11 1  +
OpenEI/UtilityRate/TieredRateMonth12 1  +
OpenEI/UtilityRate/TieredRateMonth2 1  +
OpenEI/UtilityRate/TieredRateMonth3 1  +
OpenEI/UtilityRate/TieredRateMonth4 1  +
OpenEI/UtilityRate/TieredRateMonth5 1  +
OpenEI/UtilityRate/TieredRateMonth6 1  +
OpenEI/UtilityRate/TieredRateMonth7 1  +
OpenEI/UtilityRate/TieredRateMonth8 1  +
OpenEI/UtilityRate/TieredRateMonth9 1  +
OpenEI/UtilityRate/UseNetMetering false  +
OpenEI/UtilityRate/Utility Elkhorn Rural Public Pwr Dist +
OpenEI/UtilityRate/Version 1.5  +
Categories Utility Rates  +
Modification dateThis property is a special property in this wiki. 8 December 2012 07:50:09  +
hide properties that link here 
  No properties link to this page.
 

 

Enter the name of the page to start browsing from.