Puerto Rico - Renewable Energy Equipment Certification (Puerto Rico)

(Redirected from Solar & Wind Equipment Certification (Puerto Rico))

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search

Last modified on February 12, 2015.

Rules Regulations Policies Program

Place Puerto Rico

Name Puerto Rico - Renewable Energy Equipment Certification
Incentive Type Equipment Certification
Applicable Sector Construction, Installer/Contractor
Eligible Technologies Photovoltaics, Solar Space Heat, Solar Water Heat, Wind
Active Incentive Yes

Implementing Sector State/Territory
Energy Category Renewable Energy Incentive Programs

Website http://www.aaepr.net/index.asp
Date added to DSIRE 2002-10-21
Last DSIRE Review 2012-07-08
Last Substantive Modification
to Summary by DSIRE

References DSIRE[1]


Certification of Photovoltaic Equipment EAA specifies that PV equipment must meet UL 1703 requirements, and International Electrotechnical Commission (IEC) standards, as certified by a Nationally Recognized Test Lab. The manufacturer must guarantee that the equipment will be operating at minimum 80% capacity after 20 years. The EAA provides additional technical requirements for inverters and batteries.

Certification of Equipment for Generating Wind Energy

EAA specifies that a wind turbine must meet IEC standards including 61400-1, and if it is inverter integrated 61400-2, 61400-11 and UL Std. 1741. Also the manufacturer’s data sheet, as well as a minimum 5-year warranty letter are required. There is a proposed amendment to the certification requirements for generating wind energy. See the Puerto Rico Green Energy Incentives Public Notices for more information.

The Green Energy Fund maintains lists of certified equipment, eligible for the Fund's incentives.

Incentive Contact

Contact Name General Info EAA
Department Energy Affairs Administration

Address P.O. Box 41314

Place San Juan, Puerto Rico
Zip/Postal Code 00940
Phone (787) 332 -0914

Website http://www.aaepr.net/

Authorities (Please contact the if there are any file problems.)

Authority 1: 23 L.P.R. § 1062 et seq.

Authority 2: C3268 (2008) Act No. 248
Date Effective 2008-08-10
Date Enacted 2008-08-10

Authority 3: Reglamento 7796 (Regulation for Renewable Energy System Certifications - In Spanish)

Date Enacted 2010-01-19

  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]


  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"