San Emido Geothermal Energy North Project

Jump to: navigation, search


NEPA Document Collection for: San Emido Geothermal Energy North Project
EA at San Emidio Desert Geothermal Area for Geothermal/Power Plant, Geothermal/Well Field,

EA for Development Drilling at San Emidio Desert for Geothermal/Power Plant, Geothermal/Well Field

General NEPA Document Info
Energy Sector Geothermal energy

Environmental
Analysis Type

EA

Applicant

USG Nevada LLC

Geothermal Area

San Emidio Desert Geothermal Area

Project Location

Nevada

Project Phase

Geothermal/Power Plant, Geothermal/Well Field

Techniques

Production Wells
Comments USG Nevada submitted Utilization POU on 7/25/2013
Time Frame (days)
Participating Agencies

Lead Agency

BLM

Funding Agency

none provided

Managing District Office

Winnemucca

Managing Field Office

Funding Agencies

none provided

Surface Manager

BLM

Mineral Manager

BLM
Selected Dates
Application Date 2013/07/05
Application
Document Type
POU
Scoping Initiated Date 2013/11/12
Relevant Numbers
Lead Agency
Doc Number
Serial Number NVN-092241
Lease Numbers

Proposed Action

The Bureau of Land Management (BLM), Black Rock Field Office is initiating an Environmental Assessment (EA) for a US Geothermal Nevada LLC (USGN) proposal for their San Emidio Geothermal Energy North Plant Project. The project is located entirely on land managed by the BLM. The legal description is T.30N., R.23E., section 33 and T.29.N., R.23E., section 4, MDB&M. USGN is proposing to construct a new geothermal power plant that would include up to eight wells, two high efficiency heat exchangers, an air cooling system (condenser) and a nine megawatt generator. • Support facilities would include a control building, pump control modules, geothermal pipelines and a power transmission line. • The plant would occupy approximately four acres. • The eight wells would occupy up to eight acres. • The geothermal pipeline disturbance (both injection and production) is proposed to be 11,600 linear feet at 20 feet wide (5.5 acres). • The power transmission lines are proposed to be 5,486 linear feet at 20 feet wide (2.5 acres) and will run from the plant site to an existing substation. • Access roads would run along the above proposed transmission line and pipeline corridors would a part of that disturbance. • Total new surface disturbance would be approximately 20 acres. • The project is located along the east side of the San Emidio desert approximately 12 miles south of Empire, Washoe County, Nevada.



Documents

 
 
 

Other Documents: 
 
 
 
EA/EIS Report: