RAPID/Hydropower/Washington/Pre-Existing Land Use

Jump to: navigation, search

RAPID

Regulatory and Permitting Information Desktop Toolkit

Washington Hydropower Pre-Existing Land Use Assessment(13-WA)

In Washington, a hydropower developer must consider the location and land use designations on certain land before constructing a hydroelectric project. A developer may need to obtain a Coastal Zone Certificate of Consistency from the Washington Department of Ecology to ensure compliance with the Coastal Zone Management Act and Washington’s Coastal Zone Management Program. A developer may also need to a Shoreline Substantial Development Permit, a Shoreline Conditional Use Permit, a Shoreline Variance, or a Shoreline Exemption for projects that interfere with State shorelands or are located near marine waters, streams, lakes, wetlands or floodplains.

More Information

Determine Which State and Federal Permits Apply

Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.

Contact Information

Edit U.S. Army Corps of Engineers
Section 408 Regulatory Contacts


Visit Website

| Add a Contact

List of Reference Sources

Print PDF