RAPID/Hydropower/Federal/Waste

Jump to: navigation, search

RAPID

Regulatory and Permitting Information Desktop Toolkit

Federal Hydropower Waste & Hazardous Material Assessment(18-FD)

A hydropower developer may need to prepare a Spill Prevention, Control, and Contingency Plan that minimizes the potential for the discharge of oil from an above ground storage tank. Additionally, in the event that a hazardous substance is released at the project site, the developer will need to cooperate with the U.S. Environmental Protection Agency to report and clean up the hazardous waste.

More Information

Determine Which Federal Permits Apply

Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.

Contact Information

No contacts have been added

| Add a Contact

List of Reference Sources

Print PDF