Property:PlannedCapacity

Jump to: navigation, search
Property Name PlannedCapacity
Property Type Quantity
Description The total planned capacity for a given area, region or project.

Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume.

Acceptable units (and their conversions) are:

  • 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS
  • 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS
  • 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS
  • 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS
  • 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS
  • 0.000001 TW,terawatt,terawatts,Terawatt,Terawatts,TeraWatt,TeraWatts,TERAWATT,TERAWATTS
  • 0.000000001 PW,petawatt,petawatts,Petawatt,Petawatts,PetaWatt,PetaWatts,PETAWATT,PETAWATTS
  • 0.000000000001 EW,exawatt,exawatts,Exawatt,Exawatts,ExaWatt,ExaWatts,EXAWATT,EXAWATTS
  • 0.000000000000001 ZW,zettawatt,zettawatts,Zettawatt,ZettaWatt,ZettaWatts,ZETTAWATT,ZETTAWATTS

Subproperties

This property has the following 48 subproperties:

B

C

D

E

E cont.

F

G

H

L

M

N

S

T

U

W

Pages using the property "PlannedCapacity"

Showing 25 pages using this property.

(previous 25) (next 25)

A

Akutan Geothermal Project +10 MW10,000 kW
10,000,000 W
10,000,000,000 mW
0.01 GW
1.0e-5 TW
  +
Alasehir Geothermal Power Plant +30 MW30,000 kW
30,000,000 W
30,000,000,000 mW
0.03 GW
3.0e-5 TW
  +
Alaska Geothermal Region +25 MW25,000 kW
25,000,000 W
25,000,000,000 mW
0.025 GW
2.5e-5 TW
  +
Alligator Geothermal Geothermal Project +20 MW20,000 kW
20,000,000 W
20,000,000,000 mW
0.02 GW
2.0e-5 TW
  +
Alum Geothermal Project +64 MW64,000 kW
64,000,000 W
64,000,000,000 mW
0.064 GW
6.4e-5 TW
  +
Aurora Geothermal Project +190 MW190,000 kW
190,000,000 W
190,000,000,000 mW
0.19 GW
1.9e-4 TW
  +

B

Babadere Geothermal Project +3 MW3,000 kW
3,000,000 W
3,000,000,000 mW
0.003 GW
3.0e-6 TW
  +
Bald Mountain Geothermal Project +20 MW20,000 kW
20,000,000 W
20,000,000,000 mW
0.02 GW
2.0e-5 TW
  +
Barren Hills Geothermal Project +32 MW32,000 kW
32,000,000 W
32,000,000,000 mW
0.032 GW
3.2e-5 TW
  +

C

Canby Cascaded Project Geothermal Project +5 MW5,000 kW
5,000,000 W
5,000,000,000 mW
0.005 GW
5.0e-6 TW
  +
Cascades Geothermal Region +30 MW30,000 kW
30,000,000 W
30,000,000,000 mW
0.03 GW
3.0e-5 TW
  +
Central Nevada Seismic Zone Geothermal Region +385 MW385,000 kW
385,000,000 W
385,000,000,000 mW
0.385 GW
3.85e-4 TW
  +
Clayton Valley Geothermal Project +80 MW80,000 kW
80,000,000 W
80,000,000,000 mW
0.08 GW
8.0e-5 TW
  +
Colado Geothermal Project +350 MW350,000 kW
350,000,000 W
350,000,000,000 mW
0.35 GW
3.5e-4 TW
  +
Cove Fort Geothermal Project +50 MW50,000 kW
50,000,000 W
50,000,000,000 mW
0.05 GW
5.0e-5 TW
  +
Coyote Canyon Geothermal Project +100 MW100,000 kW
100,000,000 W
100,000,000,000 mW
0.1 GW
1.0e-4 TW
  +
Crump Geyser Geothermal Project +80 MW80,000 kW
80,000,000 W
80,000,000,000 mW
0.08 GW
8.0e-5 TW
  +

D

Darrough Hot Springs Geothermal Project +30 MW30,000 kW
30,000,000 W
30,000,000,000 mW
0.03 GW
3.0e-5 TW
  +
Delcer Butte Geothermal Project +32 MW32,000 kW
32,000,000 W
32,000,000,000 mW
0.032 GW
3.2e-5 TW
  +
Desert Queen Geothermal Project +36 MW36,000 kW
36,000,000 W
36,000,000,000 mW
0.036 GW
3.6e-5 TW
  +
Drum Mountain Geothermal Project +0 MW0 kW
0 W
0 mW
0 GW
0 TW
  +

F

Fallon Geothermal Project +70 MW70,000 kW
70,000,000 W
70,000,000,000 mW
0.07 GW
7.0e-5 TW
  +
Fallon-Main Geothermal Project +30 MW30,000 kW
30,000,000 W
30,000,000,000 mW
0.03 GW
3.0e-5 TW
  +
Fireball Geothermal Project +32 MW32,000 kW
32,000,000 W
32,000,000,000 mW
0.032 GW
3.2e-5 TW
  +

G

Geysers Project Geothermal Project +33 MW33,000 kW
33,000,000 W
33,000,000,000 mW
0.033 GW
3.3e-5 TW
  +
(previous 25) (next 25)