Property Name InterconnectRequest
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "InterconnectRequest"

Showing 3 pages using this property.


RAPID/Hydropower/California/Transmission +An interconnection customer who wants to connect a generating facility to the California ISO grid must apply and meet the requirements set out by the [[California Independent System Operator]].
RAPID/Hydropower/Colorado/Transmission +Both the state and local governments are involved in the transmission permitting process. A developer may need to comply with state and local permitting requirements.
RAPID/Hydropower/New York/Transmission +A hydropower developer must file an Interconnection Request with the [[New York Independent System Operator]] (NYISO) in order to connect a new generating facility, or merchant transmission facility to the New York State (NYS) Transmission System. A developer may also need to file an Interconnection Request with NYISO for material modifications to an existing large facility or modifications to an existing Interconnection Request.