Property:EnvReviewPwrPlantSiting

From Open Energy Information

Property Name EnvReviewPwrPlantSiting
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "EnvReviewPwrPlantSiting"

Showing 15 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

R
RAPID/Geothermal/Alaska/Environment +None  +
RAPID/Geothermal/California/Environment +The [[California Energy Commission]] or a designated local county will conduct an environmental review process that replaces the California Environmental Policy Act process for geothermal power plants with a net generating capacity of over 50 MW.  +
RAPID/Geothermal/Colorado/Environment +None  +
RAPID/Geothermal/Federal/Environment +Most Plans of Utilization (POU)s require an EA or EIS.  +
RAPID/Geothermal/Hawaii/Environment +HEPA Process  +
RAPID/Geothermal/Idaho/Environment +None  +
RAPID/Geothermal/Montana/Environment +MEPA review process  +
RAPID/Geothermal/Nevada/Environment +Nevada Utility Environmental Protection Act review process  +
RAPID/Geothermal/New Mexico/Environment +None  +
RAPID/Geothermal/Oregon/Environment +None  +
RAPID/Geothermal/Texas/Environment +None  +
RAPID/Geothermal/Utah/Environment +None  +
RAPID/Geothermal/Washington/Environment +SEPA environmental review  +
RAPID/Solar/California/Environment +The [[California Energy Commission]] or a designated local county will conduct an environmental review process that replaces the California Environmental Policy Act process for power plants with a net generating capacity of over 50 MW.  +
RAPID/Solar/Nevada/Environment +Nevada Utility Environmental Protection Act review process for renewable energy facilities over 70 MW and transmission lines of at least 200 kV.  +