U
74

Property:Cost(per day)

From Open Energy Information

Property Name Cost(per day)
Property Type String


Pages using the property "Cost(per day)"

Showing 25 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

1
1.5-ft Wave Flume Facility +Contact POC  +
10-ft Wave Flume Facility +Contact POC  +
11-ft Wave Flume Facility +Contact POC  +
2
2-ft Flume Facility +Contact POC  +
3
3-ft Wave Flume Facility +Contact POC  +
5
5-ft Wave Flume Facility +Contact POC  +
6
6-ft Wave Flume Facility +Contact POC  +
A
Alden Large Flume +$5000/week  +
Alden Small Flume +$2500/week  +
Alden Tow Tank +Depends on study  +
Alden Wave Basin +Depends on study  +
B
Breakwater Research Facility +Contact POC  +
Bucknell Hydraulic Flume +Depends on personnel requirements  +
C
Carderock 2-ft Variable Pressure Cavitation Water Tunnel +Contact POC  +
Carderock 3-ft Variable Pressure Cavitation Water Tunnel +Contact POC  +
Carderock Circulating Water Channel +Contact POC  +
Carderock Large Cavitation Tunnel +Contact POC  +
Carderock Maneuvering & Seakeeping Basin +Contact POC  +
Carderock Rotating Arm Tow Tank +Contact POC  +
Carderock Subsonic Wind Tunnel +Contact POC  +
Carderock Tow Tank 1 +Contact POC  +
Carderock Tow Tank 2 +Contact POC  +
Carderock Tow Tank 3 +Contact POC  +
Chase Tow Tank +Contact POC  +
Coastal Harbors Modeling Facility +Contact POC  +