Property:CertThreshold

From Open Energy Information

Property Name CertThreshold
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "CertThreshold"

Showing 10 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

R
RAPID/Hydropower/Alaska/Power Plant +Any public utility before commencing with utility operations or receiving compensation for providing services to customers.  +
RAPID/Hydropower/Alaska/Transmission +The [[Federal Energy Regulatory Commission]] (FERC) has jurisdiction over the primary transmission lines for most hydroelectric projects. However, a public utility may need to obtain a Certificate of Public Convenience and Necessity from the [[Regulatory Commission of Alaska]] before the construction or operation of a transmission line extension projects located outside of a FERC license boundary.  +
RAPID/Hydropower/California/Transmission +Any proposed hydropower project for the construction of a transmission line of 200 kV or more.  +
RAPID/Hydropower/Colorado/Power Plant +Any public utility before constructing or operating a transmission line extension project, interconnected group net-metered hydroelectric power systems, and conduit projects less than five megawatts may need to obtain a CPCN. [[Colorado - C.R.S. 40-5-101 et seq., Utilities-New Construction – Extension]].  +
RAPID/Hydropower/Colorado/Transmission +Public utilities before construction and extension of transmission facilities in the state.  +
RAPID/Hydropower/Indiana/Transmission +If the developer is a "new electric transmission owner" it must receive authority from the [[Indiana Utility Regulatory Commission]] to operate as a public utility when constructing new transmission lines.  +
RAPID/Hydropower/New York/Power Plant +Electric corporations before beginning construction of an electric plant.  +
RAPID/Hydropower/Ohio/Transmission +Before construction of a "major utility facility," including electric transmission lines and associated facilities with a design capacity of 125 kV or more. [[Ohio – Ohio Rev. Code §§ 4906.01 et seq., Power Siting|Ohio Rev. Code. § 4906.01]].  +
RAPID/Hydropower/Vermont/Power Plant +A developer before beginning construction of transmission line extension projects, outside of FERC's jurisdiction, interconnected group net-metered hydroelectric power systems, and project's that sell retail electricity within Vermont may need to obtain a CPG.  +
RAPID/Hydropower/Vermont/Transmission +Before construction or operation of transmission line extension projects, or a group net-metered hydroelectric power system interconnections.  +