Property:CertThreshold

Jump to: navigation, search
Property Name CertThreshold
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.


Pages using the property "CertThreshold"

Showing 5 pages using this property.

R

RAPID/Hydropower/Alaska/Power Plant +Any public utilty before commencing with utility operations or receiving compensation for providing services to customers must obtain a CPCN.
RAPID/Hydropower/Colorado/Power Plant +Any public utility before constructing or operating a transmission line extension project, interconnected group net-metered hydroelectric power systems, and conduit projects less than five megawatts may need to obtain a CPCN. [[Colorado - C.R.S. 40-5-101 et seq., Utilities-New Construction – Extension]].
RAPID/Hydropower/New York/Power Plant +Electric corporations before beginning constructiion of an electric plant.
RAPID/Hydropower/Vermont/Power Plant +A developer before beginning construction of transmission line extension projects, outside of FERC's jurisdiction, interconnected group net-metered hydroelectric power systems, and project's that sell retail electricity within Vermont may need to obtain a CPG.
RAPID/Hydropower/Vermont/Transmission +Before construction or operation of tansmission line extension projects, or a group net-metered hydroelectric power system interconnections.