Primus Power Corporation Smart Grid Demonstration Project

Jump to: navigation, search

The Primus Power Corporation Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in Alameda, California.

Overview

Deploy a 25 MW - 75 MWh EnergyFarm for the Modesto Irrigation District in California's Central Valley, replacing a planned $78M / 50 MW fossil fuel plant to compensate for the variable nature of wind energy providing the District with the ability to shift on-peak energy use to off-peak periods.

References

  1. ARRA Smart Grid Demonstration Projects