NMAC 17.9.569 Interconnection of Generating Facilities with a Rated Capacity Greater than 10 MW

Jump to: navigation, search


OpenEI Reference LibraryAdd to library

Legal Document- Regulation: NMAC 17.9.569 Interconnection of Generating Facilities with a Rated Capacity Greater than 10 MW

Abstract
This rule applies to every electric utility including rural electric cooperatives and investor-owned utilities within the state of New Mexico that is subject to the jurisdiction of the New Mexico public regulation commission; it outlines the requirements for interconnection of generating facilities with a rated capacity greater than 10 MW.









Published 
N/A

Year Signed or Took Effect 
2008

Legal Citation 
NMAC 17.9.569



DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for NMAC 17.9.569 Interconnection of Generating Facilities with a Rated Capacity Greater than 10 MW
Citation

NMAC 17.9.569 Interconnection of Generating Facilities with a Rated Capacity Greater than 10 MW (2008).