Modesto Irrigation District - Photovoltaic Rebate Program (California)

From Open Energy Information

Summary

Last modified on December 17, 2014.

Financial Incentive Program

Place California


Name Modesto Irrigation District - Photovoltaic Rebate Program
Incentive Type Utility Rebate Program
Applicable Sector Commercial, Residential, Nonprofit, Local Government, State Government, Agricultural, (All MID Customers)
Eligible Technologies Photovoltaics
Active Incentive Yes
Implementing Sector Utility
Energy Category Renewable Energy Incentive Programs
Amount Systems >1 kW to 30 kW: 0.80/W AC.

Systems >30 kW to 1 MW: performance-based incentive of 0.09/kWh for 5 years.



Eligible System Size Minimum size: 1 kW.
Equipment Requirements Must use CEC-certified PV modules and inverters

Warranty Requirements: 10 years for systems, components and labor



Installation Requirements Must be grid-connected, net metered, and installed by a California contractor licensed in accordance with rules and regulations adopted by the State of California Contractors’ Licensing Board, the contractor must possess, or employ subcontractors who possess an A, B, C-10 or C-46 license.


Maximum Incentive 50% of total project costs.
Ownership of Renewable Energy Credits MID





Program Administrator PV Program Coordinator
Website http://www.mid.org/rebates/solar/default.html


References DSIREDatabase of State Incentives for Renewables and Efficiency[1]


Summary

Modesto Irrigation District offers a photovoltaic rebate program for all of their electric customers. The peak output capacity of a system must be 1 kW or greater to participate. Systems up to 30 kilowatts (kW) in capacity can receive an up-front capacity-based incentive. Systems greater than 30 kW and up to 1,000 kW (1 MW) can receive a performance-based incentive. The rebate levels will decline over time.

As of January 2014, the capacity-based rebate is $0.80 per installed watt AC, per customer account, not to exceed 50% of total project costs. These rates may be adjusted based on expected performance. As of January 2014, the performance-based incentive is $0.09 per kWh of actual electricity production over a 5-year period. As required by state law, these incentive levels will step down over time. Interested customers should refer to the rebate program packet for complete details.

Incentive Contact

Contact Name Mike Zweifel
Department PV Program Coordinator
Division Modesto Irrigation District
Address 1231 11th Street
Place Modesto, California
Zip/Postal Code 95352
Phone (209) 526-7455


Email mikez@mid.org
Website http://www.mid.org/




  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]

References

  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency" Cite error: Invalid <ref> tag; name "DSIRE" defined multiple times with different content