Mandatory Photovoltaic System Cost Estimate (Colorado)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search


Last modified on February 12, 2015.

Rules Regulations Policies Program

Place Colorado

Name Mandatory Photovoltaic System Cost Estimate
Incentive Type Line Extension Analysis
Applicable Sector Utility
Eligible Technologies Photovoltaics
Active Incentive Yes

Implementing Sector State/Territory
Energy Category Renewable Energy Incentive Programs



Availability Customer's or potential customer's peak demand must be estimated to be under 25 kW























Service Cost-benefit analysis


















Date added to DSIRE 2000-01-01
Last DSIRE Review 2013-07-23



References DSIRE[1]


Summary

At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension if the customer or potential customer provides the utility with load data (estimated monthly kilowatt-hour usage) requested by the utility to conduct the comparison, and if the customer's or potential customer's peak demand is estimated to be less than 25 kilowatts (kW). In performing the comparison analysis, the utility must consider line-extension distance, overhead/underground construction, terrain, other variable construction costs, and the probability of additions to the line extension during the life of the open extension period.

If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, then the utility must provide the comparison at no cost. If the ratio is greater than 1,000, then the customer who requests a cost comparison must pay for it.


Incentive Contact

Contact Name Section Chief
Department Colorado Public Utilities Commission

Address 1560 Broadway, Suite 250

Place Denver, Colorado
Zip/Postal Code 80202
Phone (303) 894-2000



Website http://www.dora.state.co.us/puc
     
     

Authorities (Please contact the if there are any file problems.)

Authority 1: 4 CCR 723-3-3210




















  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]

References

  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"