Project Profile
Project Start Date 2008/01/01
Estimated End Date 2015/12/31

Project City Keelung
Project State/Province Taiwan
Project Country Taiwan
Project Resource
Click here
Project Nearest Body of Water Pacific Ocean
Coordinates 25.152354814016°, 121.77842617035°
Project Footprint(km2) 0.05
Project Phase Phase 3
Project Phase Date 2013/09/30
Project Details 1. Based on the sea condition of north-east costal area.

2. A prototype 6 m 20 kW device scaled up based on the previous 2.25 m 1 kW device. 3. Structure analysis based on 50 years wave and current data. 4. Spec.:D 6m, Stroke 2.1m Total Weight: 63.7 Mt Total Length : 17.9 m PTO: Hydraulic system Power Generation Efficiency: Estimated 40%

Project Installed Capacity (MW) 0.02
Permit/License Buildout (MW) 0.02
Device Nameplate Capacity (MW) 0.02
Was This Project DOE Funded? No
Number of Devices Deployed 1
Number of Build Out Units Deployed 1
Device Units Sold? No

Main Overseeing Organization Bureau of Energy
Collaborators CSBC Corporation

Project Timeline and Milestones •2013 September 20 kW deploy

2015 20 kW grid connect