Rules Regulations Policies Program

Place Louisiana

Name Net Metering
Incentive Type Net Metering
Applicable Sector Agricultural, Commercial, Residential
Eligible Technologies Biomass, Fuel Cells using Renewable Fuels, Geothermal Electric, Hydroelectric, Microturbines, Photovoltaics, Small Hydroelectric, Wind
Active Incentive Yes

Implementing Sector State/Territory
Energy Category Renewable Energy Incentive Programs
Aggregate Capacity Limit .5%

Meter Aggregation Not addressed
Net Excess Generation Credited to customer's next bill at retail rate; carries over indefinitely

REC Ownership Not addressed

Date added to DSIRE 2003-08-01
Last DSIRE Review 2013-04-19
Last Substantive Modification
to Summary by DSIRE

References DSIRE[1]


Note: Ongoing proceedings related to net metering can be found in Docket R-31417.

Louisiana enacted legislation in June 2003 establishing net metering. Modeled on Arkansas’s law, Louisiana's law requires investor-owned utilities, municipal utilities and electric cooperatives to offer net metering to customers that generate electricity using solar, wind, hydropower, geothermal or biomass resources. Fuel cells and microturbines that generate electricity entirely derived from renewable resources are also eligible.

Per state law, net metering is available for residential systems up to 25 kilowatts (kW) in capacity, and commercial and agricultural systems up to 300 kW. In 2008 (Act 543), the state legislature increased the net metering limit from 100 kW to 300 kW for commercial and agricultural use. The Louisiana Public Service Commission (PSC) opened Docket R-31417 in July 2010 in order to review its rules to increase to the state-mandated 300 kW limit. The PSC approved the increase in May 2011. In July of 2011, the PSC adopted Net Metering Standards, after which the PSC will determine on a case-by-case basis the appropriate pricing of projects exceeding 300kW.

The Louisiana PSC also established rates, terms and conditions for net metering for utilities under its jurisdiction in November 2005.* The PSC’s rules are described below.

Utilities must provide customer-generators with a meter capable of measuring the flow of electricity in both directions. Utilities must pay for the cost of the meter itself, but customer-generators must pay a one-time charge to cover the installation cost of the meter. Net excess generation (NEG) is credited to the customer's next bill indefinitely. For the final month in which the customer takes service from the utility, the utility will pay the customer for the balance of any credit at the utility's avoided-cost rate.

By the end of each calendar year, utilities must file with the PSC a report listing all existing net-metered systems and their capacities, and, where applicable, the inverter rating for each facility. The ownership of renewable-energy credits (RECs) associated with net metering has not been addressed.

The PSC will revisit these rules once any utility's net metering purchases exceed .5% of its retail peak load.

Additional Resources:

Entergy's net-metering webpage

* The PSC regulates investor-owned utilities and electric cooperatives in Louisiana; it does not regulate municipal-owned utilities, and its rules thereby do not apply to municipal utilities. Municipal utilities must develop their own programs based on the statute.

Incentive Contact

Contact Name Public Information
Department Louisiana Public Service Commission
Division Galvez Building, 12th Floor
Address 602 North Fifth Street
Address 2 Post Office Box 91154
Place Baton Rouge, Louisiana
Zip/Postal Code 70821-9154
Phone (225) 342-4404


Authorities (Please contact the if there are any file problems.)

Authority 1: La. R.S. 51:3061 et seq.
Date Effective 2003-10-01
Date Enacted 2003-06-27

Authority 2: LA PSC Order, Docket No. R-27558
Date Effective 2005-11-30
Date Enacted 2005-11-30

Authority 3: LA PSC Docket No. R-31417