Lake George Park Commission: Stormwater Management (New York)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search


Last modified on February 12, 2015.

EZFeed Policy

Place New York


   
Applies to States or Provinces New York
Name Lake George Park Commission: Stormwater Management (New York)
Policy Category Other Policy
Policy Type Environmental Regulations
Affected Technologies Biomass/Biogas, Coal with CCS, Concentrating Solar Power, Energy Storage, Fuel Cells, Geothermal Electric, Hydroelectric, Hydroelectric (Small), Natural Gas, Nuclear, Solar Photovoltaics, Tidal Energy, Wave Energy, Wind energy
Active Policy Yes

Implementing Sector State/Province



























Program Administrator Lake George Park Commission, New York State Department of Environmental Conservation
Primary Website http://www.dec.ny.gov/regs/2486.html
Applicable Jurisdiction Municipalities within the Lake George Park must develop and implement plans and programs consistent with these regulations. If a municipality fails to do so, the Commission assumes the authority of the municipality with regards to stormwater management.


Last Review 2014-09-15


Information Source These regulations apply to Lake George Park, the boundaries of which are defined on the Commission's website: http://www.lgpc.state.ny.us/


Summary

The Lake George Park Commission is a quasi-independent commission within the Department of Environmental Protection that is responsible for environmental conservation in the Lake George Park area. The Commission has established guideline regulations for local stormwater management. The regulations are designed to prevent any increase in stormwater runoff from any development in order to reduce flooding, siltation and streambank erosion; to prevent any increase in pollution caused by stormwater runoff from development which would otherwise degrade the quality of water in Lake George and its tributaries and render it unfit for human consumption, interfere with water based recreation or adversely affect aquatic life; and to ensure that the total annual volume of surface water runoff which flows from any specific site during and following development shall not exceed that which prevailed prior to development. The regulations require permits to be obtained prior to development, construction, or land clearing within the Lake George Park and list standards to be followed by current developments. Some exemptions may apply.



Policy Contact

Contact Name David Wick
Department Lake George Park Commission

Address 75 Fort George Road, PO Box 749
Address 2 Lake George, New York 12845


Phone 518-668-9347


Email dave@lgpc.state.ny.us

     
     

Authorities (Please contact the if there are any file problems.)

Authority 1: Environmental Conservation Law

Date Enacted 1990


Authority 2: Environmental Conservation Law



















References