Interconnection Standards for Small Generators (Federal)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search

Last modified on February 12, 2015.

Rules Regulations Policies Program

Place United States

Name Interconnection Standards for Small Generators
Incentive Type Interconnection
Applicable Sector Agricultural, Commercial, Fed. Government, Industrial, Institutional, Local Government, Nonprofit, Residential, Schools, State Government, Tribal Government
Eligible Technologies Anaerobic Digestion, Biomass, CHP/Cogeneration, Geothermal Electric, Hydroelectric, Landfill Gas, Microturbines, Ocean Thermal, Other Distributed Generation Technologies, Photovoltaics, Small Hydroelectric, Solar Thermal Electric, Tidal Energy, Wave Energy, Wind
Active Incentive Yes

Implementing Sector Federal
Energy Category Renewable Energy Incentive Programs

Applicable Utilities FERC standards generally apply to all transmission-level interconnection; state standards generally apply to distribution-level interconnection

External Disconnect Switch Not addressed

Insurance Requirements "Additional liability insurance" required only "if necessary as a function of owning and operating a generating facility"

Net Metering Required No

Standard Agreement Yes

System Capacity Limit 20 MW

Date added to DSIRE 2007-10-30
Last DSIRE Review 2012-10-01

References DSIRE[1]


The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities mostly include those that interconnect at the transmission level. The FERC's standards generally do not apply to distribution-level interconnection, which is regulated by state public utilities commissions. However, the FERC has noted that its interconnection standards for small generators should serve as a useful model for state-level standards.

The FERC's standards include Small Generator Interconnection Procedures (SGIP) and a Small Generator Interconnection Agreement (SGIA). The SGIP contains the technical procedures that the small generator and utility must follow in the course of connecting the generator with the utility's lines. The SGIA contains the contractual provisions for the interconnection and spells out who pays for improvements to the utility's electric system (if needed to complete the interconnection). The standards include provisions for three levels of interconnection:

  • The "10-kilowatt (kW) Inverter Process," for certified, inverter-based systems no larger than 10 kW;
  • The "Fast Track Process," for certified systems no larger than 2 MW; and
  • The default "Study Process," for all other systems no larger than 20 MW.

The standards include technical screens for each level of interconnection. Notably, the FERC standards do not require systems to include an external disconnect switch. Utilities and customers must follow specific timelines, and guidelines for interconnection and study fees are established. Customers must obtain liability insurance "sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made." Additional liability insurance must be obtained "only if necessary as a function of owning and operating a generating facility."

* The FERC adopted interconnection standards for facilities larger than 20 MW in July 2003. (See FERC Order Nos. 2003, 2003-A, 2003-B and 2003-C.) FERC's standards for larger generators include standard Large Generator Interconnection Procedures (LGIP) and a standard Large Generator Interconnection Agreement (LGIA).

Incentive Contact

Contact Name Public Information - FERC
Department Federal Energy Regulatory Commission

Address 888 First Street, NE

Place Washington, District of Columbia
Zip/Postal Code 20426


Authorities (Please contact the if there are any file problems.)

Authority 1: FERC Order No. 2006

Date Enacted 2005-05-12

Authority 2: FERC Order No. 2006-A

Date Enacted 2005-11-22

Authority 3: FERC Order No. 2006-B

Date Enacted 2006-07-20

  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]


  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"