Interconnection Standards (West Virginia)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search


Last modified on February 12, 2015.

Rules Regulations Policies Program

Place West Virginia

Name Interconnection Standards
Incentive Type Interconnection
Applicable Sector Agricultural, Commercial, Industrial, Residential
Eligible Technologies Biomass, CHP/Cogeneration, Fuel Cells, Geothermal Electric, Hydroelectric, Landfill Gas, Photovoltaics, Renewable Fuels, Small Hydroelectric, Solar Thermal Electric, Wind
Active Incentive Yes

Implementing Sector State/Territory
Energy Category Energy Efficiency Incentive Programs, Renewable Energy Incentive Programs

Applicable Utilities All utilities











External Disconnect Switch Not required for inverter-based systems up to 25 kW; utility's discretion for all other systems


Insurance Requirements Vary by system size and/or type; levels established by PSC



Net Metering Required No








Standard Agreement Yes

System Capacity Limit 2 MW














Date added to DSIRE 2010-07-09
Last DSIRE Review 2013-04-19
Last Substantive Modification
to Summary by DSIRE
2011-05-25


References DSIRE[1]


Summary

In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the interconnection guidelines were incorporated into utility net metering tariffs (which are proposed by the utilities). In 2010, the PSC opened a docket to reconsider net metering and interconnection per H.B. 103 (2009). The Order, General Order No. 258, adopted new interconnection standards (Rules Governing Electric Utility Net Metering Arrangements and Interconnections), based almost entirely on the existing interconnection guidelines of the consensus agreement. However, several important improvements were incorporated, including tiered insurance requirements and removing the requirement for external disconnect switches in the case of smaller, inverter-based systems.

West Virginia's interconnection standards include two levels of review. The qualifications and application fees for each level are as follows:

  • Level 1 applies to certified, inverter-based systems with a rated capacity of 25 kilowatts (kW) or less. The maximum application fee for Level 1 applicants is $30.
  • Level 2 applies to certified systems with a capacity of 2 MW or less that do not meet the criteria for inclusion in Level 1. The maximum application fee is $50 plus $1 per kW of capacity.

General Order 258.1 was issued in September 2011 to correct an omission related to the Level 2 Interconnection Agreement. In May 2011, the Commission corrected the omission by incorporating provisions relating to assignment, liability, indemnity, Force Majeure, consequential damages, and default into the standard Level 2 Interconnection Agreement. These rules are effective July 18, 2011.

The rules use IEEE 1547 as the technical standard of evaluation. The rules specify the technical screens which may be applied to applications at each level of review as well as time limits for different stages of the evaluation process. Application forms and interconnection agreements are standardized.

Customer-generators must maintain $100,000 general liability for systems with nameplate capacity of 50 kW or less, $500,000 for systems with nameplate capacity of greater than 50 kW to 500 kW, and $1 million for systems with name plate capacity greater than 500 kW. Utilities may not require customers to install an external disconnect switch for inverter-based, certified systems 25 kW or less.


Incentive Contact

Contact Name General Information - PSC
Department West Virginia Public Service Commission

Address 201 Brooks Street
Address 2 P.O. Box 812
Place Charleston, West Virginia
Zip/Postal Code 25323
Phone (800) 344-5113

Fax (304) 340-0325


     
     

Authorities (Please contact the if there are any file problems.)

Authority 1: W. Va. PSC Order, Case No. 06-0708-E-GI

Date Enacted 2006-12-12


Authority 2: W. Va. Code § 24-2F-1 et seq.
Date Effective 2009-07-01
Date Enacted 2009-06-02


Authority 3: West Virginia PSC 150-33-1
Date Effective 2010-08-30
Date Enacted 2010-06-30


Authority 4 West Virginia General Order 258.1
Date Effective 2011-07-18
Date Enacted 2011-05-19

File General Order No. 258.1.pdf













  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]

References

  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"