Name Interconnection Standards
Incentive Type Interconnection
Applicable Sector Agricultural, Commercial, Fed. Government, Industrial, Institutional, Local Government, Nonprofit, Residential, Schools, State Government
Eligible Technologies Anaerobic Digestion, Biomass, CHP/Cogeneration, Fuel Cells, Fuel Cells using Renewable Fuels, Hydroelectric, Landfill Gas, Municipal Solid Waste, Other Distributed Generation Technologies, Photovoltaics, Small Hydroelectric, Solar Thermal Electric, Wind, Waste Coal, Coal-Mine Methane
Active Incentive Yes

Implementing Sector State/Territory
Energy Category Renewable Energy Incentive Programs

Applicable Utilities Investor-owned utilities

External Disconnect Switch Required

Insurance Requirements "Additional" liability insurance not required

Net Metering Required Yes

Standard Agreement Yes

System Capacity Limit 5 MW* (for systems approaching or exceeding 2 MW applicants should contact the utility for guidance on the application process)

Date added to DSIRE 2004-12-16
Last DSIRE Review 2012-08-06
Last Substantive Modification
to Summary by DSIRE

References DSIRE[1]


The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG) systems in August 2006 (52 Pa. Code § 75.21 et seq.). In July 2007, H.B.1203 required the Pennsylvania Public Utilities Commission (PUC) to develop "technical and net-metering interconnection rules for customer-generators... consistent with rules defined in other states within the service region of the regional transmission organization that manages the transmission system in any part of the [state]."

In July 2008 the PUC issued a final rulemaking order (effective November 2008) adopting new net metering regulations, but leaving the state's interconnection standards unchanged. Separately, in February 2009 the PUC issued two additional determinations affecting interconnection. One action adopted a "Policy Statement" defining application fees for different levels of interconnection review (52 Pa. Code § 69.2101 et seq.), a subject that had been left unaddressed in the existing rules. The other issued an opinion and order adopting a set of standardized interconnection applications and agreements for use by electric distribution utilities.

Pennsylvania's standards include provisions for four levels of interconnection for generators up to five megawatts (MW)* in capacity:

  • Level 1 interconnection applies to certified, inverter-based systems up to 10 kilowatts (kW) in capacity. Application fee of $100.
  • Level 2 interconnection applies to certified, inverter-based systems up to 5 MW in capacity that do not qualify or were not approved for Level 1 interconnection. Application fee of $250 plus $1.00/kilowatt (kW) of nameplate capacity.
  • Level 3 interconnection applies to systems up to 5 MW in capacity that do not qualify or were not approved for Level 1 or Level 2 interconnection. Application fee of $350 plus $2.00/kilowatt (kW) of nameplate capacity.
  • Level 4 interconnection applies to systems that do not qualify or were not approved for Level 1, Level 2 or Level 3 interconnection, and that do not export power to the grid. Application fee of $350 plus $2.00/kilowatt (kW) of nameplate capacity.

The IEEE 1547 and UL 1741 technical standards are used in evaluating interconnection requests under all levels of review. There are technical screens and specified time lines for each level of interconnection. The standards allow a single point of interconnection for a location with multiple generators. Limited interconnection to area networks is permitted. The approved application fee schedule also allows utilities to charge the customer for the cost of grid upgrades necessary to accommodate the system and costs of up to $100/hour associated with system impact, feasibility, or facility studies. Utilities are not permitted to deviate from the fee structure described above without an approval that such a deviation is appropriate from the PUC.

Customer-generators must provide an accessible external disconnect switch or access to a disconnect switch through a lock-box system. The customer-generator must pay for the disconnect switch. However, customer-generators are not required to carry liability insurance. The program web site contains draft, standardized forms for Level 1 applications and Level 2, 3 and 4 applications. Actual interconnection forms can be found on the applicable utility web site.

Utilities must designate a contact person from whom customer-generators may obtain relevant information regarding a project. A list of these contacts is available on PUC web site. Disputes may be resolved through complaint procedures available through the PUC, or through an alternative process approved by the commission.

*The administrative rules adopted in 2006 limit standardized interconnection processes to systems of 2 MW or less. However, Pennsylvania law permits net metering for certain renewable energy facilities up to 5 MW and the interconnection fee schedule is defined as applying to all "net-metered distributed generation systems." PUC staff has indicated that interconnection requests from all qualifying net-metered systems can be addressed under the standards described above; however, the standard application indicates that for projects approaching or exceeding 2 MW applicants should contact the utility for guidance on the appropriate application process.

Incentive Contact

Contact Name Scott Gebhardt
Department Pennsylvania Public Utility Commission

Address P.O. Box 3265

Place Harrisburg, Pennsylvania
Zip/Postal Code 17105-3265
Phone (717) 425-7584


Authorities (Please contact the if there are any file problems.)

Authority 1: 73 P.S. § 1648.5

Date Enacted 11/30/2004 (subsequently amended)

Authority 2: 52 Pa. Code § 75.21 et seq.
Date Effective 2006-12-16
Date Enacted 2006-08-22

Authority 3: 52 Pa. Code § 69.2101 et seq.
Date Effective 2009-04-04
Date Enacted 2009-02-27

Authority 4: PUC Opinion and Order Docket M-00051865

Date Enacted 2009-02-27

  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]