Indonesian Geothermal Development In The National Energy Scenario, Development Program To The Year 2000

Jump to: navigation, search


OpenEI Reference LibraryAdd to library

Journal Article: Indonesian Geothermal Development In The National Energy Scenario, Development Program To The Year 2000

Abstract
The electric power sector in Indonesia will be expanded with an additional generating capacity of about 5256 MW at the end of the Fourth Five-Year Development Plan 1984/85 - 1988/89 from the existing 3912 MW. At present a 30 MW geothermal condensing plant and two non-condensing of 2 MW and 0.25 MW have been operating successfully since 1983. Geothermal energy will be developed primarily for electric power and a total of 220 MW and 660 MW will be added during the 4th (1984 - 89) and 5th (1989 - 94) Five Year Plans, reaching a total capacity of nearly 1000 MW. The government will accelerate geothermal exploration of 18 areas in Sumatera, 29 in Java, 16 in Sulawesi and 14 areas in Bali, the Lesser Sunda islands and Moluccas.

Author 
Vincent T. Radja








Published Journal 
Geothermics, 1986





DOI 
10.1016/0375-6505(86)90069-6


 

Citation

Vincent T. Radja. 1986. Indonesian Geothermal Development In The National Energy Scenario, Development Program To The Year 2000. Geothermics. (!) .