Distributed Generation Study/Wyoming County Community Hospital

Jump to: navigation, search
Study Location Warsaw, New York
Site Description Institutional-Hospital/Health Care
Study Type Long-term Monitoring
Technology Internal Combustion Engine
Prime Mover Waukesha VGF L36GSID
Heat Recovery Systems Built-in
Fuel Natural Gas
System Installer Gerster Trane
System Enclosure Indoor
System Application Combined Heat and Power
Number of Prime Movers 1
Stand-alone Capability Seamless
Power Rating 560 kW0.56 MW
560,000 W
560,000,000 mW
5.6e-4 GW
5.6e-7 TW
Nominal Voltage (V) 480
Heat Recovery Rating (BTU/hr) 1000000
Cooling Capacity (Refrig/Tons)
Origin of Controller 3rd Party Off-the-Shelf
Component Integration Customer Assembled
Start Date 2001/09/26
Monitoring Termination Date 2002/09/30
Primary Power Application Based Load
Secondary Power Application
Primary Heat/Cooling Application Space Heat and/or Cooling
Secondary Heat/Cooling Application Domestic Hot Water
Capacity Factor .628
Availability 0
Electrical Efficiency (HHV)
Electrical Efficiency (LHV)
Highest Combustion Intake Air Temperature (F) 93.3°F307.206 K
34.056 °C
552.97 °R
Lowest Combustion Intake Air Temperature (F) 7.9°F259.761 K
-13.389 °C
467.57 °R
NOx Emissions Data Available No
CO Emissions Data Available No
12-Month Run Hours 6970
12-Month Energy Savings (USD)
System Cost (USD)
Report URL http://chp.nyserda.org/facilities/details.cfm?facility=37
Study Verified Yes