Distributed Generation Study/Floyd Bennett

Jump to: navigation, search
Study Location Brooklyn, New York
Site Description Other
Study Type Long-term Monitoring
Technology Microturbine
Prime Mover Capstone C60
Heat Recovery Systems Built-in
Fuel Natural Gas
System Installer Montreal Construction
System Enclosure Outdoor
System Application Combined Heat and Power
Number of Prime Movers 2
Stand-alone Capability Seamless
Power Rating 120 kW0.12 MW
120,000 W
120,000,000 mW
1.2e-4 GW
1.2e-7 TW
Nominal Voltage (V) 480
Heat Recovery Rating (BTU/hr) 230000
Cooling Capacity (Refrig/Tons)
Origin of Controller Manufacturer-Integrated
Component Integration Factory Integrated
Start Date 2005/07/21
Monitoring Termination Date 1969/12/31
Primary Power Application Based Load
Secondary Power Application
Primary Heat/Cooling Application Space Heat and/or Cooling
Secondary Heat/Cooling Application Space Heat and/or Cooling
Capacity Factor .254
Availability 100
Electrical Efficiency (HHV)
Electrical Efficiency (LHV)
Highest Combustion Intake Air Temperature (F) 99.3°F310.539 K
37.389 °C
558.97 °R
Lowest Combustion Intake Air Temperature (F) 12.1°F262.094 K
-11.056 °C
471.77 °R
NOx Emissions Data Available No
CO Emissions Data Available No
12-Month Run Hours 16164
12-Month Energy Savings (USD)
System Cost (USD)
Report URL http://chp.nyserda.org/facilities/details.cfm?facility=40
Study Verified Yes