Data:02431e03-f559-4213-ae8f-efe5b6ca28bb

No revision has been approved for this page. It is currently under review by our subject matter experts.
Jump to: navigation, search

Loading...
[edit]

<< Previous
1
2
3

Basic Information

Utility name: Elkhorn Rural Public Pwr Dist
Effective date:
2011/01/01
End date if known:

Rate name:
SECURITY LIGHT RENTAL 175-watt mercury vapor
Sector: Lighting
Description:
AVAILABLE: To all customers.

CHARACTER OF SERVICE: 1. The District will provide the yard light, install the same on Applicant’s yard pole and will service and replace the lamp periodically and the yard light, when necessary, without cost to the Applicant. The District will maintain service and replace lamps only during normal working hours except in case of an emergency. If such services are required during times other than normal working hours, the Applicant agrees to pay for such services. 2. If the Applicant desires the farm yard light installed at a location other than the District’s meter pole, the Applicant shall pay for or furnish all labor and all the necessary materials required to install the farm yard light on the Applicant’s pole. In most cases, if not installed on meter pole and it is on an existing pole belonging to customer, there is no charge. 3. In the event the Applicant desires to have a second or third farm yard light installed at other locations than the District’s meter or yard pole, the Applicant’s obligations to the District are the same as outlined in paragraph 2. 4. Services and maintenance and replacements required and rendered by the District and which are free to the Applicant shall not be covered by this agreement if such services are necessitated by acts of vandalism. 5. All kwh will be run through the customer’s meter and billed at the applicable rate.

Source or reference:
http://www.erppd.com/Rate%20schedules/2012%20Rates/Lighting%20Rates/SEDC72.pdf
Assume net metering (buy = sell):
No
Flat rate buy ($/kWh):

Flat rate sell ($/kWh):

Flat rate adjustments ($/kWh):

Fixed monthly charge ($):
$1.95000000
Comments

<< Previous
1
2
3


Seasonal/Monthly Demand Charge Structures

Period/Month Matchup
January

February

March

April

May

June

July

August

September

October

November

December

Time of Use Demand Charge Structures

Weekday Schedule
12 
am
 1 
am
 2 
am
 3 
am
 4 
am
 5 
am
 6 
am
 7 
am
 8 
am
 9 
am
10 
am
11 
am
12 
pm
 1 
pm
 2 
pm
 3 
pm
 4 
pm
 5 
pm
 6 
pm
 7 
pm
 8 
pm
 9 
pm
10 
pm
11 
pm
Jan111111111111111111111111
Feb111111111111111111111111
Mar111111111111111111111111
Apr111111111111111111111111
May111111111111111111111111
Jun111111111111111111111111
Jul111111111111111111111111
Aug111111111111111111111111
Sep111111111111111111111111
Oct111111111111111111111111
Nov111111111111111111111111
Dec111111111111111111111111
Weekend Schedule
12 
am
 1 
am
 2 
am
 3 
am
 4 
am
 5 
am
 6 
am
 7 
am
 8 
am
 9 
am
10 
am
11 
am
12 
pm
 1 
pm
 2 
pm
 3 
pm
 4 
pm
 5 
pm
 6 
pm
 7 
pm
 8 
pm
 9 
pm
10 
pm
11 
pm
Jan111111111111111111111111
Feb111111111111111111111111
Mar111111111111111111111111
Apr111111111111111111111111
May111111111111111111111111
Jun111111111111111111111111
Jul111111111111111111111111
Aug111111111111111111111111
Sep111111111111111111111111
Oct111111111111111111111111
Nov111111111111111111111111
Dec111111111111111111111111

Reactive Power Charge

Reactive Power Charge ($/kVAR):

Demand Ratchet Percentage: 0

Comments


kW


1
2
3
Next >>

Tiered Energy Usage Charge Structures

Weekday Schedule
12 
am
 1 
am
 2 
am
 3 
am
 4 
am
 5 
am
 6 
am
 7 
am
 8 
am
 9 
am
10 
am
11 
am
12 
pm
 1 
pm
 2 
pm
 3 
pm
 4 
pm
 5 
pm
 6 
pm
 7 
pm
 8 
pm
 9 
pm
10 
pm
11 
pm
Jan111111111111111111111111
Feb111111111111111111111111
Mar111111111111111111111111
Apr111111111111111111111111
May111111111111111111111111
Jun111111111111111111111111
Jul111111111111111111111111
Aug111111111111111111111111
Sep111111111111111111111111
Oct111111111111111111111111
Nov111111111111111111111111
Dec111111111111111111111111
Weekend Schedule
12 
am
 1 
am
 2 
am
 3 
am
 4 
am
 5 
am
 6 
am
 7 
am
 8 
am
 9 
am
10 
am
11 
am
12 
pm
 1 
pm
 2 
pm
 3 
pm
 4 
pm
 5 
pm
 6 
pm
 7 
pm
 8 
pm
 9 
pm
10 
pm
11 
pm
Jan111111111111111111111111
Feb111111111111111111111111
Mar111111111111111111111111
Apr111111111111111111111111
May111111111111111111111111
Jun111111111111111111111111
Jul111111111111111111111111
Aug111111111111111111111111
Sep111111111111111111111111
Oct111111111111111111111111
Nov111111111111111111111111
Dec111111111111111111111111

Comments


1
2
3
Next >>