Bowling Green Municipal Utilities - Net Metering (Ohio)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search

Last modified on May 23, 2011.

Rules Regulations Policies Program

Place Ohio

Name Bowling Green Municipal Utilities - Net Metering
Incentive Type Net Metering
Applicable Sector Commercial, Residential
Eligible Technologies Photovoltaics, Wind, Hydroelectric, Fuel Cells
Active Incentive No

Implementing Sector Utility
Energy Category Renewable Energy Incentive Programs
Aggregate Capacity Limit Negotiated with BGMU
Applicable Utilities 25 kW

Net Excess Generation BGMU

System Capacity Limit None

Date added to DSIRE 2000-01-01
Last DSIRE Review 2006-04-04

References DSIRE[1]


Bowling Green Municipal Utility (BGMU) voluntarily offers net metering to its customers. (Ohio's statewide net-metering rules apply only to investor-owned utilities.) A standard interconnection permit is available for wind, solar, hydro, fuel cells and microgenerators up to 25 kilowatts (kW) in capacity. Larger installations have site-specific requirements. The treatment of excess generation (NEG) is negotiated with BGMU. There is no limit on overall enrollment. Interconnected systems must comply with all IEEE, NEC and UL standards, as well as local requirements.

Incentive Contact

Contact Name Kevin Maynard
Department City of Bowling Green Municipal Utilities

Address 304 North Church Street
Address 2 PO Box 388
Place Bowling Green, Ohio
Zip/Postal Code 43402
Phone (419) 354-6246


  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]


  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"