Air Pollution Control Permit to Construct and Permit to Operate (Vermont)

This is the approved revision of this page, as well as being the most recent.
Jump to: navigation, search

Last modified on February 12, 2015.

EZFeed Policy

Place Vermont

Applies to States or Provinces Vermont
Name Air Pollution Control Permit to Construct and Permit to Operate (Vermont)
Policy Category Other Policy
Policy Type Environmental Regulations
Affected Technologies Biomass/Biogas, Coal with CCS, Natural Gas
Active Policy Yes

Implementing Sector State/Province

Program Administrator Vermont Department of Environmental Conservation, Air Pollution Control Division
Primary Website

Last Review 2014-09-15

Information Source


The Air Pollution Control Division of the Vermont Department of Environmental Conservation requires a permit for electrical power generation facilities that are air contaminant sources. An Air Pollution Control Permit to Construct may be required prior to commencing construction of the facility. Fuel-burning boilers, coal, oil, or natural gas-fired boiler steam generators require a permit. Gas turbines, as well as simple cycle combined with heat recovery steam turbine require permits. Projects that are in Green Mountain Power's Cow Power program that comply with specific standard requirements do not require a permit.

Policy Contact

Department Department of Environmental Conservation
Division Air Pollution Control Division

Place Waterbury
Zip/Postal Code 5671
Phone 802.241.3840


Authorities (Please contact the if there are any file problems.)

Authority 1: 10 V.S.A. Chapter 23