View Rate

Basic Information
Utility Name
City of Lodi, California (Utility Company)
EIA Id
11124
Rate Name
Group 3 Industrial Secondary
Expert Has Verified
Yes
Is Default
 
Effective Date
07/06/2007
End Date
 
Supersedes
 
Sector
Industrial
Service Type
 
Description
This schedule shall be applied to accounts with billing period demands of between 400 kilowatts (kW) and 500 kW for three consecutive billing cycles. This schedule is not available for service when another commercial/industrial schedule is applicable. Demand: The billing period and peak period demands will be the maximum average power taken during any 15-minute interval in the billing period and peak period, respectively, but not less than the diversified resistance welder load. In cases where the use of energy is intermittent or subject to violent fluctuations, a 5-minute interval may be used. Assignment to Schedule: If, in the judgement of the City, an account is expected to have billing period demand of 400 kW or more and less than 500 kW per billing cycle, the City has the option of placing the account immediately on this schedule. When an account billed on this schedule permanently changes the nature of electrical operations to such an extent that the account would in time qualify for another rate schedule, such billing change will be made as soon as practicable after verification of said changes. It shall be the responsibility of the customer to notify the City of any such changes. If billing period demand drops below 400 kW and remains there for 12 consecutive billing cycles, the City will transfer the account to the appropriate rate schedule. If billing period demand reaches or exceeds 500 kW for three consecutive billing cycles, the account will be transferred to the appropriate rate schedule. *Adjustment = California Solar Initiative Surcharge *Summer Partial Peak = 8:30 a.m. to 3:00 p.m. and 7:00 p.m. to 9:30 p.m. Monday through Friday (except holidays) *Summer Off Peak = 9:30 p.m. to 8:30 a.m. Monday through Friday and all day Saturday, Sunday and holidays. *Winter Partial Peak = 8:30 a.m. to 9:30 p.m. Monday through Friday (except holidays). *Winter Off Peak = 9:30 p.m. to 8:30 a.m. Monday through Friday and all day Saturday, Sunday and holidays.
Source or Reference
http://lodielectric.com/commercial/rateform.asp?id=12
Source Parent
 
Compensation for distributed generation
 
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
 
Character of Service
Voltage Category
 
Phase Wiring
 
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
07/16/2012 09:48:33
Aechele
07/16/2012 10:14:52
Aechele
07/16/2012 10:15:14
Aechele
07/16/2012 10:18:52
Aechele
07/16/2012 10:21:18
Aechele
07/16/2012 10:52:40
Aechele
12/07/2012 19:29:57
Urdbbot
01/28/2013 13:05:04
Rmckeel
02/18/2013 08:27:09
Aechele
02/18/2013 08:38:27
Aechele
11/14/2013 09:09:41
Ccbolan
04/16/2014 14:29:43
Iaduah
03/26/2015 15:26:29
Jayhuggins (Approval)
Seasonal/Monthly Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1
1
 
3.9
 
Time of Use Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
1
1
 
0
 
2
1
 
10.92
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111222211111111111111111111222211111111111111111111222211111111111111111111222211111111111111111111222211111111111111111111222211111111111111111111111111111111111111111111111111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Lookback Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
Lookback Percent
 
Lookback Range (months)
 
Demand Window (minutes)
 
Demand Reactive Power Charge ($/kVAR)
 
Coincident Rate Structure
Period
Tier
Max Usage
Rate $/
Adjustments $/
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Daily Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Other Demand Attributes
Demand Comments  
Tiered Energy Usage Charge Structure
Period
Tier
Max Usage
Max Usage Units
Rate $/kWh
Adjustments $/kWh
Sell $/kWh
1
1
 
kWh
0.10655
0.00125
 
2
1
 
kWh
0.11068
0.00125
 
3
1
 
kWh
0.11675
0.00125
 
4
1
 
kWh
0.12884
0.00125
 
5
1
 
kWh
0.16086
0.00125
 
Fuel Adjustments Monthly ($/kWh)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
111111113333333333333311111111113333333333333311111111113333333333333311111111113333333333333311222222224444444555544422222222224444444555544422222222224444444555544422222222224444444555544422222222224444444555544422222222223333333333333322111111113333333333333311111111113333333333333311
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222222111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Other Energy Attributes
Energy Comments  
Fixed Charge Information
Fixed Charge Units
$/month
Fixed Charge (First Meter)
128.13
Fixed Charge (Each Additional Meter)
 
Minimum Charge
 
Minimum Charge Units
 
Other Fixed Charge Attributes